Prefab Cottages and ADUs in California 2026: The Makers

November 13, 2026
Kai Andrew
Kai Andrew

If you want a prefab backyard unit in California with installation in the published price, start with Homeplex in Long Beach. Its Casita 550 starts at $214,750 installed for 560 square feet, 1 bedroom, and 1 bathroom, or $383 per square foot. Nestadu delivers fully assembled units in the Bay Area, Sacramento, Los Angeles, and San Diego, from $138,000 for a 200-square-foot Nest, and does not say whether installation, the foundation, or permits are included. kitHAUS builds smaller modules in Southern California from $119,000 with a bathroom and kitchenette, and quotes installation as a share of that price.

Homeplex prices the installed unit. Nestadu and kitHAUS price the unit and leave the rest to a quote. Our prefab ADU guide covers Abodu, Samara, Dvele, Studio Home, and California accessory dwelling unit (ADU) law. This guide covers the other makers that publish California prices, the state program that certifies factory-built homes, and the short-term rental rules in 2 cities.

The California Makers Table

The table ranks each unit by published price divided by published size, lowest first. Each maker’s price covers different work, so read the “What the price includes” column first. For Homeplex, the size is the gross figure the maker lists.

RankModel and makerPrice as publishedSizePrice per sq ftBeds and bathsWhat the price includes, as the maker states itWhere it installs
1Casita 1250, Homeplex$336,750 installed, starting1,260 sq ft$2673 bed, 2 bathSite feasibility, site prep with a standard foundation and utility installation, transportation up to 200 miles, permit management, and installation. City permit fees, third-party reports, and utility or impact fees are excludedNot published. Office in Long Beach
2Casita 1050, Homeplex$316,750 installed, starting1,050 sq ft$3023 bed, 2 bathSame as the Casita 1250Not published
3Casita 805, Homeplex$276,750 installed, starting804 sq ft$3442 bed, 2 bathSame as the Casita 1250Not published
4Casita 550, Homeplex$214,750 installed, starting560 sq ft$3831 bed, 1 bathSame as the Casita 1250Not published
5Nest Two, Nestadu$317,000, starting638 sq ft$4972 bed, 1 bathComplete interior and exterior finishes, delivered fully assembled. The page does not say whether installation, foundation, permits, or utilities are includedBay Area, Sacramento, Los Angeles, and San Diego
6Nest One, Nestadu$263,000, starting497 sq ft$5291 bed, 1 bathSame as the Nest TwoSame as the Nest Two
7Nest, Nestadu$138,000, starting200 sq ft$690Studio. The bath is optionalSame as the Nest TwoSame as the Nest Two
8Nest Studio, Nestadu$270,000, starting330 sq ft$818Studio, 1 bathSame as the Nest TwoSame as the Nest Two
Not rankedk5.10 with bath and kitchenette, kitHAUSFrom $119,00011 by 21 ftNot publishedBath and kitchenetteThe module. Delivery is "TBD based on location"Not published. Built in Southern California
Not rankedk6.12 with bath and kitchenette, kitHAUSFrom $150,00013 by 25 ftNot publishedBath and kitchenetteSame as the k5.10Not published

kitHAUS gives “235 to 330 square feet” for the whole series and no size for each module, so its rows are not ranked. Nestadu’s homepage lists the Nest One at 500 square feet, and its prefab page lists 497. The table uses the prefab page.

What Each Price Leaves Out

  • Homeplex. Its FAQ lists costs beyond typical site conditions: crane access, a site more than 150 feet from the driveway or street, electrical panel upgrades, demolition or tree removal, retaining walls, required fire sprinklers, and sewer injector pumps. Homeplex says it is the preferred installer of ADU CREW’s prefab ADUs.
  • Nestadu. The configurator adds finish packages at $15 or $30 per square foot, stucco at $7 per square foot, wood siding at $10 per square foot, and solar at $12,000 for 4 kilowatts or $30,000 for 8 kilowatts with a battery. The lead time is 8 to 10 months. Nestadu says its units are built by “our factory partners” and does not name them. As an example only, the Nest One with the $30 package comes to $277,910 before any site work.
  • kitHAUS. Its about page says modules are made in its Southern California factory and shipped flat. Its modules page puts installation by the kitHAUS team at about 15% of the module price on a project without a permit and 20% to 24% on a permitted one. As an example only, that is $17,850 on the $119,000 k5.10, or $23,800 to $28,560 if permitted.

If you want a cottage kit that your own crew builds, DC Structures ships pre-cut kits across California at $40.40 to $84.00 per square foot, and says the finished cost can be 3 to 5 times the kit price. Kits that ship to the lower 48 states are compared in our prefab cottages guide.

How California Certifies a Factory-Built Home

Sonoma County’s factory-built housing permit procedure, version 06/23/2025, cites California Health and Safety Code Division 13, Part 6, and Title 25 of the California Code of Regulations. It requires a permanent foundation, and it says that once constructed on site, factory-built housing is a permanent dwelling unit.

County inspectors verify the California Department of Housing and Community Development (HCD) Insignia of Approval on each unit or component. They inspect the parts that are not factory-built, such as foundations, garages, and decks. The county charges no plan check fee for the factory-built components and charges plan check on the on-site construction.

Homeplex’s FAQ says manufactured ADUs are certified by the U.S. Department of Housing and Urban Development (HUD) and modular ADUs by HCD. Its Casita 550 page calls that unit a manufactured detached ADU. Ask each maker in writing whether your unit carries an HCD insignia or a HUD label, because the label decides which rules your county applies.

For pre-approved ADU plans and the rental term in state ADU law, read our prefab ADU guide.

Short-Term Rental Rules in 2 Cities

Each California city sets its own rental rules. These 2 are from each city’s own page.

  • San Diego. The city’s short-term residential occupancy page says: “The San Diego Municipal Code prohibits using ADUs for short-term rental and will result in a Code violation.” Only companion units permitted before the October 15, 2017, prohibition may be used. Whole-home licenses outside Mission Beach are capped at 1% of the city’s housing units, and a Tier 2 home-sharing host must live on-site.
  • Sacramento. The city’s ADU resource center says ADUs created under the state ADU standards must be rented for terms longer than 30 days. ADUs and other residential units may be used as a short-term rental for a total of 90 days per calendar year unless the owner obtains a Bed and Breakfast Inn conditional use permit (CUP). Every short-term rental needs a Short-Term Vacation Rental Permit from the Revenue Division.

No maker publishes revenue figures, so the ADU math post shows what a backyard unit earns.

Where to Start

Compare installed prices. Homeplex is the only maker here that publishes one. Its price includes the foundation, utility installation, transportation up to 200 miles, and permit management. Ask Nestadu and kitHAUS for the same items in writing before you compare.

Check the larger Homeplex units. The Casita 1250 adds 700 square feet over the Casita 550 for $122,000, or $174 per added square foot, against $383 per square foot for the Casita 550.

Get Nestadu’s site costs quoted. Nestadu does not say whether installation, the foundation, or permits are included. Its prices run from $497 to $818 per square foot, so get those costs quoted before you use them in a budget.

Read the city’s ADU rental rule before you choose a unit. San Diego prohibits short-term rental in an ADU, and Sacramento allows 90 days a year.

Before You Order

Run these 3 checks before a deposit, in order.

  1. Read the city’s rules. Use the zoning rules guide to find the ADU and short-term rental ordinances for your address. If the city requires terms longer than 30 days, underwrite the unit as a monthly rental.
  2. Price the site work. Run the lot through the site-prep cost estimator. For delivery, permits, and fees, read the cost of prefab homes.
  3. Confirm the loan. Read how to finance an ADU and start with the lender locator. Ask whether the lender finances an HCD modular unit, a HUD manufactured unit, or both.

Finished units from makers outside California are in the 8 best prefab cabins, rated. What works once a backyard unit is in is covered in the Backyard Playbook. For related comparisons, see prefab ADUs and prefab cottages.

Planning a backyard unit in California? Book a free strategy call.

Host Camp is not a licensed tax, legal, or financial adviser. Confirm figures for your situation with a professional.

‍

0 Comments
Active Here: 0
Be the first to leave a comment.
Profile image placeholder
Circle Loading Orange
Loading
Profile image placeholder
No Name
Set
This is the actual comment. It's can be long or short. And must contain only text information.
(Edited)
Your comment will appear once approved by a moderator.
Profile image placeholder
No Name
Set
This is the actual comment. It's can be long or short. And must contain only text information.
(Edited)
Your comment will appear once approved by a moderator.
2 years ago
0
0
Load More
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Load More
Circle Loading Orange
Excited person in glasses and backwards cap against yellow background

CREATE A
FREE ACCOUNT

Get access to:
👉 Free Guides & Templates
👉 Free Tools
👉 Free Webinars
🔥 & More!
Sign Up
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.